Skip to main content
GV
SFA Piling

High Road.Buckhurst Hill, Essex

26 SFA piles and a 92m² reinforced concrete raft slab with ground beams for a new-build residential basement in Buckhurst Hill, Essex. High-plasticity London Clay and a constrained infill site between existing properties required open-bored piles to depths of up to 13.5m.

Pile Type
350mm SFA Open-Bored Piles
Number of Piles
26
Pile Depth
6–13.5m (avg 10m)
Buckhurst Hill, EssexDecember 2025
24h Quotation
Fixed Pricing
£10M Insured
12yr Warranty
THE PROJECT

SFA Piling in Buckhurst Hill.

Our team delivered the piled foundation and reinforced concrete substructure for a new-build residential property on High Road in Buckhurst Hill, Essex. The project involved a lower ground floor construction on a tight infill plot between existing neighbouring properties, requiring a carefully engineered piled solution to support the new structure on challenging ground.

The ground investigation at Buckhurst Hill revealed high to very-high plasticity London Clay from near the surface, underlain by pockets of medium-dense sand and gravel. Groundwater was encountered at 3m depth with a standing level at around 1.5m — a significant consideration for the below-ground construction. These conditions demanded piles founded well into the competent clay strata.

We installed 26 Sectional Flight Auger (SFA) piles at 350mm diameter, open-bored to depths ranging from 6m to 13.5m depending on the structural loads — with an average depth of 10m. Individual pile loads varied from 70kN to 305kN, each reinforced with 5H12 bar cages. All 26 piles underwent sonic integrity testing to confirm structural soundness.

Following piling, the foundation included a 92m² reinforced concrete raft slab at 200mm thickness, supported by over 90 linear metres of RC ground beams at various depths. Full anti-heave protection was provided using 225mm Cordek Cellcore beneath all RC elements to guard against clay heave. The complete piling and foundations package was delivered in approximately five and a half weeks.

TECHNICAL SPECIFICATIONS

350mm SFA Open-Bored Piles. 6–13.5m (avg 10m) Deep.

Complete technical breakdown of the piling and foundation works delivered at Buckhurst Hill, Essex.

SFA Piling installation at Buckhurst Hill, Essex
Pile Type350mm SFA Open-Bored Piles26 installed

Load Capacity

70–305kN per pile

Ground Conditions

London Clay (high plasticity) over Sand & Gravel

Slab Area

92m²

Slab Thickness

200mm RC with ground beams

Anti-Heave

225mm Cellcore HX5

Concrete Grade

C28/35 DC-1

Duration

5.5 weeks

SITE PHOTOS

Project Gallery.

WHERE WE WORK

London & Southern England

Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.

1,200+
Projects Completed

Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

London
Fitzrovia
020 4634 5936
Southampton
Hampshire
023 9433 1836
Leatherhead
Surrey
01372 236377
Coverage Map - London and Southern England

Areas we cover:

Central LondonNorth LondonSouth LondonEast LondonWest LondonEssexRomfordChelmsfordKentDartfordMaidstoneSurreyCroydonGuildfordSussexBrightonCrawleyHampshireSouthamptonPortsmouthBerkshireReadingSloughHertfordshireWatfordSt Albans
TESTIMONIALS

Trusted by Professionals

Real feedback from homeowners, contractors, and structural engineers across London and the South.

Google4.9
Google Reviews
BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

05/ACCREDITATIONS

Certified & Compliant

We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Logo

CPCS Accredited

Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Logo

CHAS Premium

The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline

Constructionline Gold

The UK's most connected and progressive provider of procurement and supply chain management services.

Get in Touch

Tell Us About Your Project

Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.

We Reply the Same Day

Send an enquiry and we'll respond within working hours - usually within a few hours, not days.

Quote Within 24 Hours

Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.

Clear, Itemised Quote

We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.