Skip to main content
GV
SCD Piling Contractors

SCD Piling.For Difficult Ground.

Steel Case Driven piling pushes soil aside rather than drilling through it. This means it works in wet, unstable ground where augered piles would collapse - and creates zero excavated waste on contaminated sites.

Spoil
Zero
Max Load
400kN
Contaminated sites High water table No spoil removal Rapid install
24h Quotation
Fixed Pricing
£10M Insured
12yr Warranty
WHY SCD PILING

Zero Spoil Solution. Contaminated Ground Safe.

Wet ground. Unstable soil. Contaminated land. When augered piles would collapse or create disposal headaches, SCD is the answer.

Ground Too Wet or Unstable?

When ground is waterlogged or unstable, augered piles can collapse before concrete is poured. That's where SCD piling comes in. Instead of drilling a hole, we drive a steel casing into the ground - displacing the soil rather than removing it.

The steel tube stays in place, creating a stable void for concrete. This works in conditions where other methods fail - high water tables, loose fill, and soft clays. On contaminated sites, there's a bonus: no excavated spoil means no disposal costs.

Steel Cased Pile Installation

Displacement Method

Pushes soil aside - works in wet ground, creates no waste.

SCD Is Your Solution When...

Ground is wet or waterlogged
Soil is loose, soft, or unstable
High water table causing problems
Contaminated land with disposal concerns
Augered piles would collapse
Other piling methods have been ruled out

Need a Complete Package?

We can include RC foundations with your piling quote.

View Foundations
SCD PILING TECHNICAL SPECS

150mm - 273mm Diameters. Up to 400kN Capacity.

150-273mm diameters. Up to 15m+ depth. 400kN maximum capacity. SCD piling works in wet ground, unstable soils, and contaminated sites - conditions that would defeat standard augered piles.

Get SCD Piling Quote
SCD Piling Equipment on Construction Site
Maximum Capacity400kNat 273mm diameter

Pile Diameters

150mm - 273mm standard sizes (150, 168, 220, 273mm) to match your load requirements.

Depths + Pre-Drilling

Driven to 15m+ or refusal. Can pre-drill through harder layers to extend the method to more ground types.

Zero Spoil

Displacement method = no excavation. No contaminated waste handling, testing, or disposal costs.

12-Year Warranty

Every SCD pile backed by our 12-year structural warranty and £10M insurance. Full documentation for Building Control.

Load Capacity by Diameter (SWL)

Ø 150mm100 kN
Ø 168mm150 kN
Ø 220mm300 kN
Ø 273mm400 kN

Safe Working Load (compression) - actual capacity subject to ground conditions and design verification

SCD PILING FAQ

Frequently Asked Questions

Common questions about Steel Cased Driven piling for contaminated and challenging ground.

SCD (Steel Cased Driven) piling uses hollow steel tubes that are hammered into the ground from the inside using a drop hammer or Grundomat. Once driven to refusal, the casing is filled with concrete and reinforced. No soil is excavated - it's displaced instead.
Yes - SCD piling is ideal for contaminated sites. Because the soil is displaced rather than excavated, no contaminated spoil is removed. This eliminates expensive hazardous waste disposal and reduces health and safety risks on brownfield sites.
SCD piling excels in high water table conditions. The sealed steel casing keeps groundwater out during installation, and the concrete is placed directly into the dry casing. Other methods may struggle with water ingress during pile formation.
Made ground is land that has been filled or modified by human activity—old foundations, rubble, industrial waste, or imported fill material. SCD piling is well-suited to made ground because the driven casing can penetrate variable fill without needing to remove it.
SCD uses internal driving methods (drop hammer inside the casing) which are quieter than external impact driving. While not silent like CFA, SCD produces less noise and vibration than traditional driven piles, making it suitable for many urban locations.
SCD piles support 100-400kN depending on diameter. 150mm piles carry 100kN, 220mm carry 300kN, and 273mm carry up to 400kN. For lighter structural loads and challenging ground conditions, SCD offers a cost-effective solution.

Have a question not listed here?

Call our team
WHY GEOVEX

We Optimize the Design. You Keep the Savings.

General engineers design the structure; we optimize the build. We simplify complex reinforcement and select the most efficient method to save you time and money.

Local Ground Knowledge

After 20 years and thousands of piles across London and Southern England, we often already know the ground conditions in your area.

Fixed Pricing

We itemise every quote so you know exactly what you're paying for. When we have all the data we need, we can fix the price completely.

Designated Project Manager

No call centres or sales teams. You'll have a named project manager who handles your job from quote to completion. We're a family business - questions get answered, not escalated.

Every Rig Type In-House

Mini, CFA, SFA, screw, steel cased - we own them all. We pick the most cost-effective method for your ground, not just the one we happen to have on the truck.

20+Years in business
12Year warranty

We explain your options, then let you decide

We'll tell you if piling isn't necessary for your project
We'll suggest alternatives if they'll save you money
We'll explain the trade-offs between different methods

Our reputation is built on repeat business and referrals. We'd rather lose a job than recommend work you don't need.

WHERE WE WORK

London & Southern England

Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.

1,200+
Projects Completed

Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

London
Fitzrovia
020 4634 5936
Southampton
Hampshire
023 9433 1836
Leatherhead
Surrey
01372 236377
Coverage Map - London and Southern England

Areas we cover:

Central LondonNorth LondonSouth LondonEast LondonWest LondonEssexRomfordChelmsfordKentDartfordMaidstoneSurreyCroydonGuildfordSussexBrightonCrawleyHampshireSouthamptonPortsmouthBerkshireReadingSloughHertfordshireWatfordSt Albans
TESTIMONIALS

Trusted by Professionals

Real feedback from homeowners, contractors, and structural engineers across London and the South.

Google4.9
Google Reviews
BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

05/ACCREDITATIONS

Certified & Compliant

We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Logo

CPCS Accredited

Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Logo

CHAS Premium

The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline

Constructionline Gold

The UK's most connected and progressive provider of procurement and supply chain management services.

Get in Touch

Tell Us About Your Project

Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.

We Reply the Same Day

Send an enquiry and we'll respond within working hours - usually within a few hours, not days.

Quote Within 24 Hours

Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.

Clear, Itemised Quote

We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.