The two jobs above are both single houses. This page is also for developers, builders, groundworkers and engineers with drawings for housing plots, commercial buildings and schemes with a programme measured in weeks.
For that scale the usual answer is CFA piling. A hollow-stem auger drills to depth and concrete is pumped through it as it comes out, with no casing. It makes less noise and vibration than driven piling, which suits urban sites.
Whatever the method, you deal with a named project manager from quote to completion. We are a family business with more than 20 years of family experience in piling.