Lydd Road shows how we like to work: four bungalows, 64 piles and the ground beams, all from one contractor.
Our clients are builders, developers, groundworkers and structural engineers with drawings ready. This page is written for housing plots, commercial buildings and programmes of several weeks, and shorter jobs are welcome too.
For larger schemes CFA piling is the usual method. A rig installs 10 to 20 piles a day, depending on diameter and depth.
To quote a Kent site we need the drawings, the address and the ground investigation report if one exists. A detailed quote comes back within 24 hours of the drawings.
Every job carries a 12-year workmanship and materials warranty, subject to its terms, along with the pile records Building Control asks for.