Bulls Green Cottage.Arkesden, Essex

9 screw piles and a 28m² reinforced concrete raft slab for an extension to a thatched cottage in Arkesden, Essex. Boulder clay ground and an existing well beneath the footprint required a carefully designed piled foundation with full anti-heave protection, completed in just four days.

Pile Type
76R Screw Piles (triple helix)
Number of Piles
9
Load Capacity
50–80kN per pile
Arkesden, EssexNovember 2025
24h Quotation
Fixed Pricing
£10M Insured
12yr Warranty
THE PROJECT

Screw Piling in Arkesden.

Our team delivered the screw pile foundation and reinforced concrete raft slab for an extension to Bulls Green Cottage, a characterful thatched property in the village of Arkesden near Saffron Walden in Essex. The extension required a piled solution to transfer building loads through variable near-surface soils to competent ground beneath.

The geological profile at Arkesden indicated boulder clay extending to significant depth, providing a consistent bearing stratum well-suited to helical screw piles. An existing well within the building footprint added complexity to the pile layout, requiring careful positioning of the nine pile locations around the obstruction.

We installed 9 Type 76R screw piles with triple helix lead flights, each torqued into the boulder clay using an excavator-mounted attachment. Safe working loads ranged from 50kN to 80kN depending on position, with all piles achieving installation pressures that exceeded the engineer's design requirements — confirming adequate bearing capacity across the full layout.

The 28m² reinforced concrete raft slab was cast at 250mm thickness using C28/35 concrete with A393 mesh reinforcement top and bottom, supported on 225mm Cellcore HX-S anti-heave void formers. The building inspector approved the foundation on the day of the pour, and the entire project was completed in four days from mobilisation.

TECHNICAL SPECIFICATIONS

76R Screw Piles (triple helix). 50–80kN per pile Deep.

Complete technical breakdown of the piling and foundation works delivered at Arkesden, Essex.

Screw Piling installation at Arkesden, Essex
Pile Type76R Screw Piles (triple helix)9 installed

Ground Conditions

Boulder Clay

Slab Area

28m²

Slab Thickness

250mm RC with A393 mesh

Anti-Heave

225mm Cellcore HX-S

Concrete Grade

C28/35

Duration

4 days

SITE PHOTOS

Project Gallery.

WHERE WE WORK

London & Southern England

Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.

1,200+
Projects Completed

Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

London
Fitzrovia
020 4634 5936
Southampton
Hampshire
023 9433 1836
Leatherhead
Surrey
01372 236377
Coverage Map - London and Southern England

Areas we cover:

Central LondonNorth LondonSouth LondonEast LondonWest LondonEssexRomfordChelmsfordKentDartfordMaidstoneSurreyCroydonGuildfordSussexBrightonCrawleyHampshireSouthamptonPortsmouthBerkshireReadingSloughHertfordshireWatfordSt Albans
TESTIMONIALS

Trusted by Professionals

Real feedback from homeowners, contractors, and structural engineers across London and the South.

Google4.9
Google Reviews
BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

05/ACCREDITATIONS

Certified & Compliant

We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Logo

CPCS Accredited

Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Logo

CHAS Premium

The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline

Constructionline Gold

The UK's most connected and progressive provider of procurement and supply chain management services.

Get in Touch

Tell Us About Your Project

Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.

We Reply the Same Day

Send an enquiry and we'll respond within working hours - usually within a few hours, not days.

Quote Within 24 Hours

Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.

Clear, Itemised Quote

We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.