The Avenue.Chichester, West Sussex

38 CFA piles and a 116m² reinforced concrete raft slab for a residential rear extension in Chichester, West Sussex. Extremely hard flint-laden ground wore down drilling equipment and collapsed bores, but our team adapted on site to deliver the foundation on budget.

Pile Type
300mm CFA Piles
Number of Piles
38
Pile Depth
3–7m (avg 6m)
Chichester, West SussexNovember 2025
24h Quotation
Fixed Pricing
£10M Insured
12yr Warranty
THE PROJECT

CFA Piling in Chichester.

Our team delivered the piled foundation for a substantial rear extension to a residential property on The Avenue in Chichester, West Sussex. The extension required a steel-framed structure with a piled raft slab, and with 20 protected trees close to the works, Continuous Flight Auger (CFA) piling was chosen as the most efficient method for the ground conditions.

The pile design was based on British Geological Survey data, which indicated Made Ground overlying sand and gravel with chalk at approximately 4–6m depth. On site in Chichester, the ground proved far more challenging than expected — extremely hard flint deposits wore down two lead augers and all follower augers, requiring tooling repairs twice during the programme.

We installed 38 CFA piles at 300mm diameter, with actual depths ranging from 3m to 7m. Several bores initially collapsed in the upper strata, but by drilling an additional metre into competent chalk, the bores lined themselves and held. This technique was adopted on 11 production piles. Six piles were drilled to practical refusal in the dense flint, and additional piles were installed to compensate for reduced depths. Every pile underwent sonic integrity testing before the slab pour.

The 116m² reinforced concrete raft slab was cast at 200mm thickness using C32/40 grade concrete, with 225mm Cellcore void formers beneath to protect against clay heave. Despite the challenging ground, the complete piling and foundations package was delivered in approximately five weeks.

TECHNICAL SPECIFICATIONS

300mm CFA Piles. 3–7m (avg 6m) Deep.

Complete technical breakdown of the piling and foundation works delivered at Chichester, West Sussex.

CFA Piling installation at Chichester, West Sussex
Pile Type300mm CFA Piles38 installed

Load Capacity

60kN per pile

Ground Conditions

Made Ground over Sand, Gravel & Flint over Chalk

Slab Area

116m²

Slab Thickness

200mm RC with A393 mesh

Anti-Heave

225mm Cellcore HX-S

Concrete Grade

C32/40

Duration

5 weeks

SITE PHOTOS

Project Gallery.

WHERE WE WORK

London & Southern England

Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.

1,200+
Projects Completed

Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

London
Fitzrovia
020 4634 5936
Southampton
Hampshire
023 9433 1836
Leatherhead
Surrey
01372 236377
Coverage Map - London and Southern England

Areas we cover:

Central LondonNorth LondonSouth LondonEast LondonWest LondonEssexRomfordChelmsfordKentDartfordMaidstoneSurreyCroydonGuildfordSussexBrightonCrawleyHampshireSouthamptonPortsmouthBerkshireReadingSloughHertfordshireWatfordSt Albans
TESTIMONIALS

Trusted by Professionals

Real feedback from homeowners, contractors, and structural engineers across London and the South.

Google4.9
Google Reviews
BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

05/ACCREDITATIONS

Certified & Compliant

We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Logo

CPCS Accredited

Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Logo

CHAS Premium

The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline

Constructionline Gold

The UK's most connected and progressive provider of procurement and supply chain management services.

Get in Touch

Tell Us About Your Project

Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.

We Reply the Same Day

Send an enquiry and we'll respond within working hours - usually within a few hours, not days.

Quote Within 24 Hours

Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.

Clear, Itemised Quote

We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.