Tudor Rose.Chertsey, Surrey

27 CFA piles and 120 linear metres of reinforced concrete ground beams for a replacement dwelling in Chertsey, Surrey. Gravel soils with a high water table at just one metre required sideform shuttering to all ground beams and comprehensive anti-heave protection against the underlying clay.

Pile Type
350mm CFA Piles
Number of Piles
27
Load Capacity
90–270kN per pile
Chertsey, SurreyNovember 2025
24h Quotation
Fixed Pricing
£10M Insured
12yr Warranty
THE PROJECT

CFA Piling in Chertsey.

Our team delivered the complete piled foundation for a replacement dwelling at Tudor Rose on Laleham Reach in Chertsey, Surrey. The new building required 27 piles and an extensive ground beam layout to support the full footprint of the house on challenging riverside ground.

The site investigation at Chertsey revealed topsoil over a shallow clay layer, underlain by a 5.75-metre band of gravel before reaching deep London Clay beneath. Groundwater sat at just one metre below ground level — a significant factor for both piling and ground beam construction. These conditions demanded a piled solution founded into the competent gravel stratum, with comprehensive anti-heave measures to protect against clay movement at depth.

We installed 27 Continuous Flight Auger (CFA) piles at 350mm diameter using a Klemm 708 compact rig. Safe working loads ranged from 90kN to 270kN across the pile layout, with every pile reinforced with 4H12 bar cages and sonic integrity tested to confirm structural soundness. On the best production day, the team completed 12 CFA piles — strong output for a compact rig on a residential site.

Following piling, 120 linear metres of 600mm by 450mm reinforced concrete ground beams were constructed with full sideform shuttering — necessary due to the loose soils and high water table. All beams sat on 155mm Cellcore HXB anti-heave void formers with Heaveguard to internal faces, protecting the foundation against clay heave. The complete piling and ground beam package was delivered in approximately five weeks.

TECHNICAL SPECIFICATIONS

350mm CFA Piles. 90–270kN per pile Deep.

Complete technical breakdown of the piling and foundation works delivered at Chertsey, Surrey.

CFA Piling installation at Chertsey, Surrey
Pile Type350mm CFA Piles27 installed

Ground Conditions

Gravel over London Clay, water table at 1m

Ground Beams

600 × 450mm RC, 120Lm

Anti-Heave

155mm Cellcore HXB + Heaveguard

Concrete Grade

C28/35 – C35 DC-1

Rig Used

Klemm 708

Duration

5 weeks

SITE PHOTOS

Project Gallery.

WHERE WE WORK

London & Southern England

Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.

1,200+
Projects Completed

Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

London
Fitzrovia
020 4634 5936
Southampton
Hampshire
023 9433 1836
Leatherhead
Surrey
01372 236377
Coverage Map - London and Southern England

Areas we cover:

Central LondonNorth LondonSouth LondonEast LondonWest LondonEssexRomfordChelmsfordKentDartfordMaidstoneSurreyCroydonGuildfordSussexBrightonCrawleyHampshireSouthamptonPortsmouthBerkshireReadingSloughHertfordshireWatfordSt Albans
TESTIMONIALS

Trusted by Professionals

Real feedback from homeowners, contractors, and structural engineers across London and the South.

Google4.9
Google Reviews
BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

BT
Ben Turner

"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."

AW
Andy Wigmore

"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."

KD
Karan Dixit

"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."

FF
Farshid Fariba

"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."

05/ACCREDITATIONS

Certified & Compliant

We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Logo

CPCS Accredited

Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Logo

CHAS Premium

The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline

Constructionline Gold

The UK's most connected and progressive provider of procurement and supply chain management services.

Get in Touch

Tell Us About Your Project

Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.

We Reply the Same Day

Send an enquiry and we'll respond within working hours - usually within a few hours, not days.

Quote Within 24 Hours

Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.

Clear, Itemised Quote

We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.