"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."
Riseley, Berkshire
30 SCD mini-piles and a 154m² reinforced concrete raft slab for a new commercial dairy building in Riseley, Berkshire. Sandy clay over London Clay and nearby mature trees demanded a piled foundation to 6m depth, completed on programme and on budget.

SCD Piling in Riseley.
Our team delivered the piled foundation for a new dairy building at Village Maid Cheese in Riseley, near Reading. The award-winning cheesemaker needed a larger production facility, requiring a robust foundation on a rural site with mature Hybrid Black Poplar trees within the zone of influence.
The site investigation at Riseley revealed non-shrinkable sandy clay in the upper 1.5m, underlain by London Clay. Although the near-surface soils were favourable, the presence of significant trees at 21m from the building footprint and the expected shrinkable clay at depth made a piled solution the right choice for long-term structural stability.
We installed 30 Steel Cased Driven (SCD) mini-piles at 150mm diameter, each driven to 6 metres depth. Safe working loads ranged from 70kN to 160kN across the pile layout, with all piles reinforced with 2H16 rebar cages to full depth. Every pile was set-tested on site to confirm bearing capacity before the slab pour.
The 154m² reinforced concrete raft slab was cast at 250mm thickness using C28/35 grade concrete, completing the foundation for the new dairy. The building inspector praised the quality of workmanship, and the entire project was delivered within four weeks from mobilisation to handover — on programme and on the original quote.
150mm SCD Mini-Piles. 6m Deep.
Complete technical breakdown of the piling and foundation works delivered at Riseley, Berkshire.

Load Capacity
70–160kN per pile
Ground Conditions
Sandy Clay over London Clay
Slab Area
154m²
Slab Thickness
250mm RC
Concrete Grade
C28/35 DC-2
Duration
4 weeks
Project Gallery.
Every Method. One Team.
We assess your site and ground conditions, then recommend the most suitable piling method - not just the one we happen to have available.

Mini Piling
The cost-effective solution for extensions and new builds. Our 750mm wide rigs access tight spaces while delivering high load capacity (up to 400kN) for residential and commercial projects.
CFA Piling
High-capacity continuous flight auger piling for commercial developments. Fast installation (10-20 piles/day) with minimal noise and vibration. Ideal for urban sites requiring loads up to 2,500kN.
SFA Piling
The specialist solution for low headroom and internal works. Operates in just 2.4m height—perfect for basements, underpinning, and working inside existing buildings without compromising capacity.
SCD Piling
Steel cased driven piles for contaminated, wet, or unstable ground. The displacement method creates zero spoil, eliminating hazardous waste disposal costs while ensuring a dry, sealed casing for concrete.
Screw Piling
Rapid, dry installation with immediate load capacity. No concrete, no curing time, and minimal ground disturbance. Ideal for eco-friendly builds, temporary structures, and working near trees.
Foundations
Complete reinforced concrete packages including ground beams, pile caps, and rafts. We handle the piling and the concrete works together, delivering a finished base ready for your builder.
London & Southern England
Three offices across the region means we're genuinely local to your project - not a distant company sending rigs across the country.
Extensions, new builds, basements, underpinning, and commercial foundations across London and Southern England.

Areas we cover:
Trusted by Professionals
Real feedback from homeowners, contractors, and structural engineers across London and the South.
"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."
"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."
"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."
"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."
"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."
"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."
"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."
"What can I say, the team were a pleasure to deal with from start to finish. My wife and I did a fair amount of due diligence... Our experience was that they seemed to go the extra mile. A shout out to Barrie the project manager but of course not forgetting Lenny and Baz who worked tirelessly throughout. And a special thank you to Ben Crabb - right from our first conversation, you proposed options and were so helpful and informative."
"A really nice family business that we couldn't recommend more highly. We had a 14m x 11m foundation concrete slab with mini piles completed within their estimation of 4 weeks... The building inspector said he wished all his clients were up to their standards! From my many phone calls with Ben from the outset through to Ricky, Barrie and Shane (3 brothers) they are all so friendly and helpful."
"What a breath of fresh air to deal with a company that exceeds all of your expectations. From my first contact with Barrie in the office to the two hardworking men, Dan and Lenny who carried out the job, I have been so impressed with their professionalism, capability and friendliness. Thank you for a job 'very well done'."
"We chose them for our extension. The sales person Ben was extremely helpful with his comments and always available to discuss matters and never missed a call back. Ricky the project manager explained what was happening throughout the procedure with phone calls and I must mention Rachel for any issues we had. Overall very good job done."
Certified & Compliant
We adhere to the highest industry standards for safety, quality, and environmental management.

CPCS Accredited
Construction Plant Competence Scheme. Ensuring our operators meet the highest standards of safety and skill.

CHAS Premium
The Contractors Health and Safety Assessment Scheme. Demonstrating compliance with risk management standards.

Constructionline Gold
The UK's most connected and progressive provider of procurement and supply chain management services.
Tell Us About Your Project
Send us your drawings, describe your site, or just ask a question. We'll get back to you with a proper answer - not a generic response.
We Reply the Same Day
Send an enquiry and we'll respond within working hours - usually within a few hours, not days.
Quote Within 24 Hours
Send us your drawings and we'll return a detailed quote within 24 hours - often the same day for straightforward projects.
Clear, Itemised Quote
We'll explain what's included: pile type, diameter, depth, quantities, and any optional extras. No jargon, no hidden costs.